Elevated guideway construction advancing through the Central Valley.Image credit: California High Speed Rail Authority
California High Speed Rail
Design Build Contractor Representation
Right of way coordination for Construction Package 2 3 of the statewide high speed rail system, delivered from the contractor side of the table.
Contractor side advocacy
Protected contractor interests and mitigated schedule and liability exposure as land rights were secured concurrently with active design.
Coordinated on three fronts at once
Parcel level right of way tracking, agency clearance monitoring, and third party agreement review kept design build packages moving.
Flagged risk before it became a claim
Documented delay drivers early and advised leadership on exposure that needed active management, not absorption.